About Community Mining Permits (IPR) and Community Mines in Indonesia

 

Within Indonesia’s bustling mining sector, there are two important terms for local miners aiming to operate legally and sustainably: Community Mining Permit (IPR) And Community Mining Area (WPR).

​

The IPR, or Community Mining Permit, is the golden key for local residents or cooperatives, granting them the legal right to engage in small-scale mining.

 

WPR, or Community Mining Area, designates specific zones where these mining activities can be carried out under the protection of the IPR.

 

Understanding and obtaining these permits is a crucial step for any miner who wants to protect their operations and legally benefit from Indonesia’s rich mineral resources.

​

Let’s explain everything related to IPRs and WPRs, as well as how to obtain them, below.  

langkah_obtaining_permit_mining_community.webp
Anchor 1

Title

​

​

​

Why Every Artisanal Miner Needs an IPR

For small-scale miners, obtaining a Small-Scale Mining Permit (IPR) is crucial for several very compelling reasons. It would be a major oversight and naive not to have an IPR if you are involved in small-scale mining.

​

The Dangers of Not Operating Under the IPR Framework.

Anchor 2
danger_no_has_permit_mining_community.webp
Anchor 3

Benefits of Miners Having an IPR

We'll outline these points and the benefits of IPR in more detail below. It's important for you to know.

​

Legal Protection and Compliance: IPR provides legal recognition and legitimacy to mining activities, ensuring that operations fall within national legal and regulatory frameworks. This protects miners from legal action that could be taken against them for mining without a permit.

​

Protection from Confiscation: With IPR, miners are protected from confiscation of valuable assets such as mining equipment, extracted gold, and essential supplies like fuel and chemicals. This legal protection ensures that their hard-earned investments and resources are recognized and protected by law.

​

Lawsuit Prevention: Operating without an IPR puts miners at risk of arrest and criminal prosecution. Having an IPR guides their operations in accordance with legal standards, significantly reducing the risk of legal sanctions, including imprisonment.

​

Reduction of Levies and Extortion: Legalizing operations through an IPR reduces the likelihood of becoming victims of extortion or blackmail. Miners with an IPR are less likely to be targets of corrupt practices because their activities are officially registered and monitored.

​

Stability in Business Operations: IPR formalizes the terms and conditions under which miners operate, protecting them from arbitrary demands from third parties. This stability allows miners to plan and operate their businesses without fear of unexpected changes imposed by external forces.

​

Access to Legal Roads: In cases of disputes or violations of their rights, miners with IPRs have access to legal recourse through formal channels. This access is essential for defending their rights and resolving conflicts through the judicial system.

​

​

What are WPR and IPR?

​

Understanding WPR (People's Mining Area)

WPRs, or Community Mining Areas, serve as designated areas where legal mining activities are permitted. The government specifically designates WPRs for small-scale mining operations, ensuring these activities are limited to areas that can sustainably support mining without compromising environmental and social standards. To establish a WPR, the area must meet certain criteria, such as ecological suitability, mineral availability, and minimal conflict with local communities.

​

Understanding IPR (People's Mining Permit):

An IPR, or People's Mining Permit, is essentially a building permit for mining on land designated as a WPR. An IPR grants the holder the right to extract minerals within the WPR boundaries, legitimizing their operations under national law. This license is crucial for miners because it not only allows them to mine legally but also provides legal protection, ensuring they can operate without fear of sanctions for illegal activities.

​

The relationship between WPR and IPR

The relationship between a WPR and an IPR is crucial for legal mining operations. You can think of a WPR as a plot of land designated for development (mining), while an IPR is the permit that allows you to build (mine) on that land. Without a designated WPR, you cannot apply for an IPR, and without an IPR, you cannot legally mine even if you are within the WPR. This system ensures that mining activities are regulated and occur in areas best suited for mining, minimizing environmental and social impacts.

​

Analogy as an Illustration of the Relationship Between WPR and IPR

Think of a WPR (People's Mining Area) as a piece of land you own or control. An IPR (People's Mining Permit) is like the house you build on that land. Without owning or controlling the land (WPR), you cannot legally build your house (IPR) on it. And simply owning land without building a house does not allow you to live there.— You need both land and a house to make it your home.

​

​

How to Legalize Your Mining Operation: A Step-by-Step Guide

Legalizing your artisanal mining operation involves obtaining a People's Mining Permit (IPR), which ensures your activities are recognized and regulated by the government. Here's a clear, step-by-step guide to help you transition from informal to formal mining operations:

​

Understand the Requirements: Understand the legal requirements for obtaining an IPR, which typically include proving your status as a local citizen or a cooperative made up of local citizens.

​

Preparing the Required Documentation: Gather all essential documents, which may include personal identification, proof of residence, and details of the mining area.

​

Get a Business Identification Number (NIB), which is a business identification number required for all business activities in Indonesia.

​

Applying for a People's Mining Area (WPR):  Before you can apply for an IPR, you need to ensure your mining area is designated as a WPR. This involves submitting a proposal to local authorities to officially recognize your area as suitable for mining activities. This process is actually more complicated and takes longer than applying for an IPR. We'll explain this in more detail later in this article, so don't worry.

​

Submitting Your IPR Application: Once your area is designated as a WPR, submit your IPR application to the Ministry of Energy and Mineral Resources. Ensure your application includes all required documentation, such as an environmental impact assessment and your NIB.

​

Waiting for Approval: After submission, there will be a waiting period during which your application will be reviewed. Stay in touch with the relevant authorities to track the progress of your application and provide additional information if needed.

Receiving your IPR: Once approved, you will receive your IPR, officially legalizing your mining operation. This permit is typically valid for up to ten years, with the possibility of renewal.

​

Periodic Compliance Checks: With your IPR, ensure you consistently comply with all operational, environmental, and safety standards to avoid penalties or the risk of losing your license.

​

​

All about WPR

​

Why is WPR Important?

​

Identify Suitable Mining Areas: The Community Mining Area (CMA) is crucial because it defines and marks areas specifically suitable for community mining. This determination is based on geological surveys and assessments that confirm the presence of exploitable mineral resources suitable for small-scale operations. By designating these areas, the government ensures that community mining is concentrated in areas where the activity is most feasible and the mineral resources are accessible.

​

Resource Management: The establishment of the WPR facilitates the efficient management of the country's mineral resources. This prevents indiscriminate mineral exploitation and ensures that artisanal mining is carried out in areas that can be managed sustainably. This strategic allocation helps preserve the nation's mineral wealth, ensuring that these resources are used effectively and responsibly.

​

Facilitating Legal and Organized Mining: The WPR is crucial for the formalization of mining activities. The WPR serves as a prerequisite for obtaining a People's Mining Permit (IPR), which legalizes artisanal mining operations. This formalization process is crucial for bringing miners into the legal framework, ensuring that their activities are recognized by law and that they receive the necessary support and protection.

​

The establishment of the WPR is fundamentally about identifying areas with potential for successful and sustainable artisanal mining. The WPR provides a structured and legal framework within which miners can operate, ensuring that both mineral resource exploitation and the interests of the miners are managed fairly.

​

​

How to Establish a WPR?

Establishing a WPR involves a structured process that requires thorough exploration and formal approval. Let's look at why a WPR is important and how to obtain one:

​

Step 1: Exploration

​

Initial Survey: Conduct a preliminary geological survey to identify areas with potential mineral deposits. This involves field work by geologists to map the area and identify promising locations.

​

Sampling: Geologists take samples from these identified points and prepare them for laboratory analysis. This step is crucial for determining the quality and quantity of mineral reserves.

​

​

Step 2: Laboratory Analysis

​

Sample Testing: Collected samples are sent to a registered laboratory that meets government standards. The laboratory performs a detailed analysis to confirm the presence of minerals.

​

Report Preparation: Based on the laboratory results, a comprehensive report is prepared. This report typically includes 100-200 pages of detailed analysis, including a certificate from a certified laboratory.

​

Step 3: Local Support / Outreach

To ensure a successful application, it is important to document the process. " socialization" Formally. Socialization means you have sufficient approval and support from the local population. Don't underestimate it. This involves holding public meetings with local community representatives, landowners, and other stakeholders to discuss your mining project and gain their approval.

​

First, hold public meetings with representatives of local communities, landowners, and stakeholders. Invite representatives from the local ESDM branch to participate in these meetings to provide official oversight and support.

​

During these meetings, ensure all discussions and agreements are documented in detail. This includes taking formal meeting minutes and taking photos and videos to provide visual evidence of the process.

 

Next, secure written consent and signatures from all participants, including local representatives, landowners, stakeholders, and ESDM officials. This consent should clearly state their support for your mining project.

 

Maintaining organized records of all meetings, approvals, and documentation is crucial. File all documents properly and ensure they are readily accessible for review by authorities. This thorough documentation will help avoid repeating processes due to inadequate records.

​

Finally, include all documented evidence of the socialization process in your application. This demonstrates that you have the necessary local support and have followed the required procedures.


By thoroughly documenting the socialization process, you not only ensure compliance with regulatory requirements but also build a strong foundation of local support for your mining project.

​

​

Step 4: Competent Person Indonesia (CPI) Statement

​

CPI Endorsement: Exploration reports must be certified by a Competent Person Indonesia (CPI). A CPI is a qualified and authorized individual who verifies that the exploration was conducted properly and that the area is suitable for mining.

​

​

Step 5: Submission and Approval

 

Submit WPR Application to ESDM Branch: Once the exploration report and CPI support are ready, submit your application to the local branch of the Ministry of Energy and Mineral Resources (ESDM). They must coordinate with the provincial ESDM office. Alternatively, submit your application directly to the provincial ESDM office.

​

ESDM Review: The local/provincial ESDM branch will review your application and may request changes or additional information to ensure compliance with all criteria.

​

Governor's Recommendation: The local ESDM branch needs to obtain a recommendation from the governor of the province where the proposed WPR is located.

​

Forward to Central ESDM: With the governor's recommendation, the local ESDM branch sends the completed application and supporting documents to the ESDM Pusat (head office) in Jakarta. Be sure to ask them for confirmation of receipt from the ESDM Pusat.

​

Coordination with Spatial Planning Authority: The Central ESDM coordinates with the government branch responsible for spatial planning to ensure that the proposed area is suitable for artisanal mining.

​

WPR Confirmation: If all documents are complete and the Central ESDM agrees that the area is suitable for artisanal mining, they will issue a WPR confirmation.

​

Return to the Provincial ESDM Branch: The confirmation is then sent back to the provincial ESDM branch, completing the process. This is then coordinated with the local ESDM branch.

​

Now you have established the prerequisites for handling IPR.

​

​

​

How to Apply for IPR

Follow These Steps to Get Your Permit

Anchor 4
Anchor 5
Anchor 6
ilustrasi_method_obtaining_permit_mining_community.webp
Anchor 7
Anchor 8
Anchor 9
Anchor 10
Anchor 11

Step 1: Form a Cooperative

Forming a cooperative is beneficial because it allows you to obtain an IPR of up to 10 hectares, whereas individuals can only obtain up to 5 hectares.

Ensure your cooperative is registered and involves local residents.

​

​

Step 2: Provide the Intended Coordinates

Clearly define and provide the coordinates of the mining area in question.

Make sure the coordinates are within the designated People's Mining Area (WPR).

​

​

Step 3: Get Local Support

Document your local engagement efforts by holding public meetings

with local representatives, landowners, and stakeholders. Obtain and document their support for your mining venture. This includes obtaining signatures and written consent.

​

Be thorough in keeping clean records, including photos, videos, and meeting minutes.

​

​

Step 4: Fill Out the IPR Application Form

Complete the official IPR application form with accurate and detailed information.

​

​

Step 5: Provide Required Documents

Collect and file the required documents, including:

​

  1. Business Identification Number (NIB) or Business Identification Number

  2. KTP (Resident Identity Card)

  3. Letter from the village (kelurahan) head confirming your local residence

  4. Fiscal Certificate

​

Additionally, submit a letter to the tax authorities stating your intention to apply for an IPR and your willingness to pay taxes on the mining proceeds. This can garner support from the tax office and put pressure on the Ministry of Energy and Mineral Resources to expedite the process.

​

​

Step 6: Submit Your Application to the Local ESDM Branch

Submit your complete application package to the local branch of the Ministry of Energy and Mineral Resources (ESDM).

​

The local ESDM branch will accept your application and may request additional documents, such as:

​

  • UKL (Environmental Management Plan)

  • UPL (Environmental Monitoring Plan)

​

This study ensures compliance with basic environmental regulations. Although regulations state that the Ministry of Energy and Mineral Resources must fund this study, be prepared to cover the costs yourself to avoid delays.

​

​

Step 7: Provide Additional Documents and Make Adjustments

Follow requests for additional information or adjustments from ESDM.

Ensure that all documents are complete and meet the requirements.

​

​

Step 8: Involve Lawyers and/or Journalists

If possible, have a lawyer accompany you during meetings with government officials. A lawyer can help ensure the process is followed according to laws and regulations.

​

The presence of an attorney can add weight to your application and signal to officials that the process is being closely monitored, reducing the likelihood of irregularities.

​

​

Step 9: Maintain Complete Documentation

Ask your attorney or other knowledgeable individual to sign the minutes of the meeting as additional verification.

​

Document each step thoroughly to prevent the need to repeat the process due to inadequate documentation.

​

​

Step 10: Wait for the Process

Once you have submitted all the required documents and addressed any requests for adjustments, you will need to wait for your application to be processed.

​

Be prepared for a potentially long waiting period, requiring patience and persistence.

​

By carefully following these steps and maintaining complete documentation, you can navigate the process of obtaining an IPR and secure the legal status required for your mining activities. Involving an attorney can further ensure the process runs smoothly and complies with legal standards.

​

​

​

Cost of Obtaining WPR and IPR

​

Know the Fees You Need to Pay

Establishing a Community Mining Area (WPR) and obtaining a Community Mining Permit (IPR) involves significant costs and a series of detailed steps. Here is a comprehensive breakdown of the costs you should anticipate.

​

Costs Associated with Establishing a WPR

The first major cost is related to the exploration required to establish the WPR. This involves conducting geological surveys and mapping to identify and narrow down potential mining locations. Geologists need to collect samples, which are then sent to a registered laboratory for analysis to confirm the presence of minerals. Laboratory analysis and the preparation of a detailed exploration report—which typically includes 100–200 pages of analysis and certificates from a certified laboratory—are essential components of this process.

​

An important part of the exploration phase is obtaining approval from an Indonesian Competent Person (CPI). The CPI, a qualified and authorized individual, verifies

​

In addition to exploration costs, there are also administrative and processing costs. These include costs for the review and processing of exploration reports by the local ESDM office, costs associated with obtaining a recommendation from the provincial governor, and expenses related to coordination efforts by the Central ESDM with spatial planning authorities. These administrative costs vary depending on the province and specific requirements (both formal and informal) but add to the total expenses.

​

​

Costs Associated with Obtaining an IPR

Once an area has been designated as a WPR, you can proceed with the IPR application. The first step involves filling out the IPR application form and ensuring that all required information is provided accurately. You will need to cover the costs associated with obtaining and submitting various documents, such as:

​

  • Business Identification Number (NIB) or Business Identification Number,

  • proof of identity and residence

  • letter from your village head,  

  • tax clearance certificate (Fiscal Certificate).

​

In addition, you must draft and submit a letter to the tax authorities stating your intention to apply for an IPR and your willingness to pay taxes on mining proceeds.

​

Environmental compliance costs are another significant expense. These include Environmental Management (UKL) and Environmental Monitoring (UPL) studies required to ensure compliance with basic environmental regulations. Although regulations state that these studies must be funded by the Ministry of Energy and Mineral Resources (ESDM), in practice, you will likely need to cover these costs to avoid delays. These environmental compliance efforts can range from tens to several hundred million rupiah (IDR).

​

Engaging a lawyer to accompany you during meetings with government officials and to sign the minutes of those meetings can add to your legal costs. This step, while optional, is highly recommended because it ensures the process is followed according to laws and regulations, adds weight to your application, and reduces the likelihood of irregularities.

​

​

Total Cost for WPR and IPR

The total cost of establishing a WPR and obtaining an IPR can be substantial. The establishment process WPR can cost between 1 to 3.5 billion rupiah (IDR), including exploration, CPI approval, and administrative costs.

​

The application process  IPR  eating costs an average of 200–350 million rupiah (IDR), covering documentation, environmental compliance, and legal fees. Understanding these costs and preparing for them will help you navigate the process more efficiently and increase your chances of successfully obtaining the necessary permits for your mining activities.

​

​

​

Realistic Timeline: How Long Does It Take to Get a WPR and IPR

​

What to Expect During the Process

Navigating the process of establishing a Community Mining Area (WPR) and obtaining a Community Mining Permit (IPR) can be complex and time-consuming. Here is a detailed overview of what you can expect at each phase.

 

Timeline for Establishing a WPR

The initial phase, known as project preparation, typically takes about one month. During this time, resources are organized, a team is formed, and exploration activities are planned. Following this, a public outreach period is required, which lasts another month. This involves engaging with local communities, representatives, and stakeholders to inform them about the upcoming exploration and secure their support.

​

The exploration phase itself is quite extensive, lasting approximately three months. During this period, geologists conduct surveys, map the area, and collect samples. These samples are sent to a registered laboratory for analysis, and the process involves narrowing down potential mining locations. A detailed exploration report is then prepared, typically containing 100-200 pages of analysis and a certificate from a certified laboratory. This report must be certified by a Competent Person Indonesia (CPI).

 

Once the exploration report is completed—a process that takes about two weeks—it is submitted to the local ESDM office for review, a process that usually

​

The next step involves submitting the application, along with the governor's recommendation, to the ESDM Center in Jakarta. This stage can take two to six months. The ESDM Center coordinates with the government branch responsible for spatial planning. If all documents are complete and the area is deemed suitable for artisanal mining, they will issue a WPR confirmation.

​

The entire process, from project preparation to the formal declaration of the WPR, involves numerous interactions with various government agencies and takes a total of approximately 6.5 months or more.

​

​

Timeline for Obtaining an IPR

Once the area is designated as a WPR, you can proceed with the IPR application. The first step is to form a cooperative, which takes about two weeks. This is advantageous because cooperatives can obtain permits for up to 10 hectares, compared to 5 hectares for individuals.

​

The next step is to identify and select specific areas within the WPR where you intend to conduct mining activities. This selection process also takes about two weeks. Following this, a two- to six-week outreach period is required. During this time, you will hold meetings with local communities and stakeholders to gain their support and document their consent.

​

The IPR application package, including all required documents and approvals, is then submitted to the local ESDM branch. This application process takes approximately three days. The local ESDM branch reviews the IPR application for one to five months, during which time they may request additional information or modifications.

​

Once all reviews are complete and approval is obtained, the IPR declaration is issued.

The entire process, from the formation of the cooperative to the IPR declaration, usually takes about four months or more.

​

​

Overall Timeline for WPR and IPR ​

The process of establishing WPR generally takes about 6.5 months or more. 

IPR takes approximately 4 months or more. Given the complexity and the approvals required at various stages, it is important to be prepared for a lengthy process.

 

  • Processing Time WPR: 6.5 months or more.

  • Processing Time IPR: 4 months or more.

  • Total: 10–11 months.

​

Patience and thorough documentation are key to successfully navigating this bureaucratic process. Differences between provinces are normal, so the timelines stated above are averages. They can be quicker or longer depending on who you're dealing with and whether they're supportive or reluctant.

​

​

​

Tips for Easier Approval

​

Keep Good Records: Here’s How

Maintaining neat and organized documentation throughout the process of establishing a WPR and obtaining an IPR is crucial. Start by documenting every interaction and meeting with local communities, representatives, and stakeholders during the socialization phase. Record meeting minutes, take photos and videos, and ensure all discussions and agreements are documented in detail. Having local representatives and stakeholders sign the minutes adds a layer of accountability and support.

​

In addition, keep all your application documents organized. This includes exploration reports, support from an Indonesian Competent Person (CPI), and all correspondence with local and central ESDM offices. File all documents properly and make them easily accessible for review by the authorities.

​

Well-organized records help you track the progress of your application and make it easier to quickly address requests for additional information or changes.

​

Stay Safe and Follow the Rules

Engaging a lawyer can significantly simplify the process of obtaining an IPR. A lawyer experienced in mining regulations can provide valuable guidance, ensuring all legal requirements are met. Having a lawyer accompany you during meetings with government officials can enhance the credibility of your application. This signals to officials that the process is being closely monitored, reducing the likelihood of discrepancies or delays. A lawyer can also assist in compiling and reviewing all necessary documents, ensuring they are completed correctly and comply with regulations.

 

Compliance with environmental regulations is essential.

Although regulations state that the Ministry of Energy and Mineral Resources (ESDM) must fund environmental studies such as the UKL (Environmental Management Plan) and UPL (Environmental Monitoring Plan), you often have to cover these costs yourself to avoid delays. Ensuring compliance with environmental and safety regulations not only increases your chances of approval but also demonstrates your commitment to responsible mining practices.

​

Work with a Geology Team That Has a Proven Track Record with ESDM

Utilizing an experienced geology team with a proven track record can significantly improve the quality and accuracy of your exploration efforts. Engaging geologists who have experience working with the ESDM division responsible for your application can be highly beneficial. These geologists are familiar with the ins and outs of the process, the dos and don’ts, as well as the preferences and behavior of ESDM officials.

​

Established relationships with the ESDM can facilitate smoother communication and reduce the likelihood that your exploration report will be rejected or require significant revisions.

 

If possible, ask an ESDM official for a recommendation on which geologist you should hire. The official will likely suggest someone they know well. Meeting with the recommended geologist, getting to know them, and establishing a good working relationship is crucial. Ensure you have a clear and well-defined contract with them outlining responsibilities and expectations before proceeding with any exploration work.

 

By following these steps carefully, maintaining complete documentation, involving an attorney, and utilizing an experienced geologist, you can significantly increase your chances of approval.

 

Patience and persistence are the keys, as this process involves several steps and can be time-consuming. However, with a

​

​

​

Legal Framework for IPR Under Law No. 3 of 2020

 

Definitions: A Small-Scale Mining Permit (IPR) is a permit that authorizes mining activities in designated small-scale mining areas, subject to restrictions on area size and investment (Article 1, point 10).

​

Commodities: Small-scale mining activities are classified into three categories (Article 66):

​

a. Metal Mineral Mining

b. Non-metallic Mineral Mining

c. Rock Mining

​

Issuance: The Minister grants IPR to local individuals or cooperatives consisting of local residents (Article 67, paragraph 1). To obtain an IPR, the applicant must submit a request to the Minister (Article 67, paragraph 2).

​

Area Limits: The maximum area that can be covered by one IPR is:

​

  • Up to 5 hectares for individuals

  • Up to 10 hectares for cooperatives (Article 68, paragraph 1)

​

Duration: An IPR is granted for a period of up to 10 years and may be renewed twice, with each renewal lasting 5 years (Article 68, paragraph 2).

​

​

​

​

WPR and IPR Related Downloads

​

 

​
 

Need Help Obtaining an IPR?

We have extensive experience navigating the process of obtaining a WPR and IPR, and we're here to help. Having guided countless individuals through this complex journey, we understand the nuances and challenges involved. Our expertise can make this process smoother and more efficient for you.

​

We can assist with the exploration required to establish a WPR, ensuring it meets all regulatory requirements. In addition, we offer support in finding cost-effective solutions for artisanal mining operations under an IPR. There is significant potential for error in this process, and our experience can help you avoid costly mistakes.

​

By leveraging our knowledge and experience, you can accelerate your business, avoid unnecessary expenses, and increase your chances of securing approval. Let us help you navigate the complexities of small-scale mining permits efficiently and effectively.