Iridium refining system: TS-ATM-I200
The Solution to refining of Iridium

This iridium refining system is designed to handle capacity 200 kg per batch With a process line that includes atomization, pressure leaching, alkaline leaching, alkaline fusion, water leaching, iridium refining, calcination, and hydrogen reduction, producing iridium powder with purity 99,95%.
This system requires electricity around 400, as much water as 33 tons, and the installation area is as wide 90 m2 At least height 5 ft.Equipped with Air exhaust system and wastewater neutralization system, this system is designed to operate safely and efficiently.
The needed chemicals include sulfate acid, nitrate acid, chloride acid, alkaline chemicals, hydrogen gas, carbon active, and floculanThe buyer is responsible for civilian construction, steel platforms, major cable connections to distribution cabinets, water pipes, as well as liquid waste disposal.
Tool packages include a complete set of iridium refining devices, but installations are not included in packages and are available as additional options. This system is equipped with warranty 1 year.
refining System Specification
Extraction Range
Iridium
Capacity:
200 kg per batch
Iridium refining:
Processive plots include making powder through atomization, followed by pressure leaching, alkali cylinders, alkali sprinkles, water treatment, iridium refining, calcination, hydrogen reduction, to produce iridium powder with 99,95% purity.
The creation of powder through atomization
pressure leaching
Alkali peppers
Alkaline sprinkle
Watershowers
Irridium refining
Calcination
The hydrogen reduction
The End Product
Iridium Book
99.95%
Tool Set
One Complete Production Tool Wet refining Mixed Iridium 200 kg
Electrical Needs
- 400,450 kW.
The Need for Water
33 tons
Exhaust
Yes
Wastewater Neutralization System
Yes
Chemical Needs / Material
Sulfuric acid
Nitric acid
Chloride acid
Alkali Chemicals
Hydrogen Gas
Carbon Active
Flokulan
Required Area Area
Area 90 m2
Height: 3.5 m
The Purchaser's Account
The buyer is responsible for the civilian construction and construction of the steel platform.
The buyer is responsible for connecting the main cable to our distribution cabinet, and we are responsible for connecting the distribution cabinet to the equipment.
The buyer is responsible for connecting the water pipe to the area we have determined.
The buyer is responsible for the pipes and direction of the liquid waste disposal after the pump.
Installation
not included. Additional options.
warranty
1 year