Leend

7 Jun 20161 mnt

Black Mamba Goes Kalimantan

Alat Tambang Emas Modern Di KalSel


Tujuan: Tabalong, Kalimantan Selatan Model: Black Mamba Gold Dredge
 
Klien: Korporate Kapasitas: 90-120 meter kubik per jam
 
ExW: Juni 2016 Team Size: 3-4


WE WISH THE CLIENT A LOT OF GOLD IN SHORT TIME AND SMOOTH MINING OPERATIONS!!!

Salam Tambang.

    15
    0